Its been a few weeks since I have made an update. Lots has been going on in that time but I was waiting for some good pics before adding it all to the blog. Ok so last post we just had our upper roof going on.. since then we have had a lot of work done on the inside of the house. Firstly, the roof scaffolding was lowered so that our lower roof could be put on. We have also had our electrical, plumbing and air-conditioning rough in completed. We have had our lower and upper external walls wrapped. Windows and external doors and cavities for sliders have been installed and today we had wall insulation put it. Tomorrow they will be gyprocking the house.... so exciting. Bricks will start the week after next and I think thats what i'm excited about the most. Its really starting to look like a house now.

We had a little hiccup with the downstairs hall niches.. they have been framed up to be the size of doors....oops.. drafting error. Have been assured this will be fixed before gyprocking tomorrow. Here is some photo spam for you all....








No comments:

Post a Comment